Used Self Erect Cranes Maryland - The base of the tower crane is typically bolted to a large concrete pad which provides really crucial support. The base is connected to a mast or a tower and stabilizes the crane which is affixed to the inside of the building's structure. Often, this attachment point is to an elevator shaft or to a concrete lift.
Generally, the mast is a triangulated lattice structure measuring 0.9m2 or 10 feet square. The slewing unit is attached to the very top of the mast. The slewing unit is made of a gear and a motor that enable the crane to rotate.
Tower cranes are able to have a maximum unsupported height of eighty meters or two hundred sixty five feet. The tower crane's maximum lifting capacity is 16,642 kilograms or 39,690 lbs. with counter weights of 20 tons. Additionally, two limit switches are utilized in order to ensure the driver does not overload the crane. There is also another safety feature known as a load moment switch to ensure that the operator does not surpass the ton meter load rating. Last of all, the maximum reach of a tower crane is 70 meters or two hundred thirty feet.
There is certainly a science involved with erecting a tower crane, specially due to their extreme heights. First, the stationary structure needs to be transported to the construction site by using a big tractor-trailer rig setup. Then, a mobile crane is utilized so as to assemble the equipment part of the jib and the crane. After that, these parts are connected to the mast. Afterward, the mobile crane adds counterweights. Crawler cranes and forklifts may be a few of the other industrial equipment that is utilized to erect a crane.
As the building is erected, mast extensions are added to the crane. This is how the crane's height could match the building's height. The crane crew uses what is called a climbing frame or a top climber which fits between the top of the mast and the slewing unit. A weight is hung on the jib by the work crew so as to balance the counterweight. Once complete, the slewing unit can detach from the top of the mast. In the top climber, hydraulic rams are used to adjust the slewing unit up an extra 6.1m or 20 feet. Then, the crane driver uses the crane to insert and bolt into place another mast part piece.
Self Erect Cranes PDF